The water used for power generator is turned to a
lower reservoir and an outlet drains the water off. Then during pumping, it
takes the water from the lower reservoir which becomes full when the designated
blue portion level is reached.
During outlet construction, lessening of alteration
area and changes in its design are considered. A 2,000m2 reduction
of the tunnel road for construction at the alteration area was re-studied. |
calculation
 |