Intake

The intake takes the water from an upper reservoir for use in the power generator. It is  built in the central left bank part of the upper reservoir with an entrance at 18.8m width and 7.5m height, and consists of two articles which are of concrete structures at 122m and 126m length. It has gate shaft which is 49m in height.
Escalation
Back to plan