| Environment |
|
|
Preface
A large river in Japan, Omaru River is flowing from west to east in the
central part of Miyazaki Prefecture. Its catchment area is 474km2 and 75
km in length.
Located in the middle class region of Omaru River, the project point of
Omarugawa Hydraulic Plant is of mountain climate with an annual precipitation
that exceeds 3,000mm.The normal temperature is as warm as 170C and hardly
snows.
The rich geographic and climatic characteristics of the river basinfs natural environment reflects, that part of it is specified as Osuzu Natural Park.
For Omarugawa Hydraulic Power Plant Construction Office to maintain the
rich natural environment of the catchment area in Omaru River, the "Environmental
Plan" was enacted during the construction of Omarugawa Plant and various measures were carried out.
The Environmental Plan is constituted by the following basic idea and statement
of principles :
Basic idea
The Omarugawa Hydraulic Power Plant Construction Office of Kyushu Electric
Power Co., Inc. promotes environmental preservation activity that aims
of symbiosis with nature and the community while recognizing the importance
of the global environmental preservation based on "Kyushu Electric
Power Environmental Charter."
Statement of principles
@ It strives for rich natural preservation of Omaru River valley.
A The environmental purpose and a target are set
up to strive for a continued improvement of environmental management system.
B An agreement, a regulation system and etc. about
an area and environmental preservation are observed to strive for cooperation
with the community.
C It strives for the creation of an environment
gentle to the natural recovery and the living things until completion of
construction.
D It strives for proper processing of waste, effective use and recycling.
|
| 1.
Protection of precious animals and plants |
| In order to protect
precious animals and plants checked around the construction zone, various
measures against preservation are performed. |
@Environmental
preservation measures of individual Japanese umbrella pine
In the past, there was a continuous felling of Japanese umbrella pine that
its species is now precious. This portion of Miyazaki is located in
the southern part of Japan.
Considering the individual effect, a structural change with a lessened
felling and possible transplanting of trees and guarding it as well are
taken as a conservation measure and transplanting plan after the completion
of construction.
AMeasure against
preservation of mountain hawk-eagle
Mountain hawk eagles are carnivores which are at the top of the ecosystemfs
food cycle which shows importance of protection of all living things existing
in the area.
Due to environmental alteration and pollution, mountain hawk eagle which
is originally few in number had been continuously decreasing. Its existence
was found around the construction zones. Thus, to avoid the bad effects
during construction, needed measures against noise and vision as well as
short intervals during construction had been implemented.
|
 |
 |
|
2. Preservation of River
Water Quality
|
In order to avoid the bad effect on the river water quality by construction,
"cloudy water processing equipment" is installed in every construction
zone where the cloudy water generated in each zone is purified.
Furthermore, the water quality in a down-stream river is measured and checked
periodically if in normal condition. Moreover, river water is detouring
the construction zone through the temporary drainage canal.
|
| 3. Recycling
of construction by-product |
The rock dug from the underground power plant or a waterway tunnel are
reformed into a uniformed particle diameter size, and mostly are used as
concrete aggregate.
Moreover, after drying the discharge from the cloudy water processing equipment
(drying cake) solidification agent was added to the concentrated slurry
and was used as landfill material for the land that was developed for housing
lots in construction zones.
In addition, wooden and concrete wastes generated from the construction
zones are also recycled as much as possible.
|
| 4. Tree
Planting |
To harmonize with the circumferential environment, the alteration and
digging of surfaces and disposal sites were done in minimum necessity.
Tree planting is considered a method to recover and protect the original
nature of the environment which had been affected by cut-offs and landfills.
The temperature around the upper reservoir is low that makes it better to plant the seeds at the lower dam where the temperature is high, through the spraying method.
Moreover, at the alteration zone around the upper reservoir and its surrounding
areas, planting of local seeds taken from the original resources is considered
for the purpose of restoring the original natural environment. Planting
of about 40 kinds of 100,000 local saplings is now being planned.
|
 Sapling |
|
5. Acquisition
of ISO 14001 Authentication
|
In order to perform environmental activity more systematically, attestation of ISO 14001 was acquired in August, 2001. Annual investigation is obtained and both the internal and external examination is properly and accurately undertaken.
|
|
|